Home / Leeds City Council
Case study

Leeds City Council

200 playgrounds and outdoor gyms across the city, coated and reopened.

200

Playgrounds and outdoor gyms

16,000+ m²

Surface area coated

All

Sites reopened

Applying Protect Professional across Leeds City Council play equipment.

The challenge

Leeds City Council had more than 200 playgrounds and outdoor gyms closed across the city, and a public that wanted them back. Reopening them was not a cleaning problem. Play equipment is touched constantly, by hundreds of different children a day, and a surface wiped at eight in the morning is recontaminated within minutes of the first visitor.

The council needed something that kept working between visits rather than at the moment of application, and it needed it across the entire geographical area of the city, to a tight turnaround, without a cleaning crew standing permanently at every gate.

Before anything was specified, the council’s own review examined our independent test data. Two questions mattered to them: that the coating was genuinely effective, and that it was non-toxic once bonded to the surface. Play equipment is the least forgiving setting there is, and they were satisfied on both counts before a single site was treated.

What we did

We treated every touch point, not just the obvious ones. Play equipment, outdoor gym apparatus, benches and access gates were all coated, covering more than 16,000 square metres of surface across the estate.

The scale and the deadline meant this could not be a supply-only contract. We provided training to the council’s teams so application was consistent from site to site, and ran an install service across the whole of the city’s geography to hit the reopening window.

  • Play equipment and outdoor gym apparatus across more than 200 sites
  • Benches and access gates, so the whole journey through a site is covered, not just the equipment
  • Training plus a city-wide install service, delivered to the council’s reopening timetable

Why coating rather than more cleaning. A cleaning regime resets a surface at a point in time. On play equipment, the gap between that reset and the next child is measured in minutes. The coating is what governs the hours in between, which is the part a cleaning rota cannot reach.

The results

Every playground and outdoor gym in the programme reopened. The coating gave the council a defensible basis for reopening at pace, across the whole city, rather than site by site as cleaning capacity allowed.

What happened next

The programme was covered by LeedsLive and by BBC Radio Leeds, which put the approach in front of other local authorities facing the same reopening problem.

More case studies

Make every surface a dead end for pathogens.

Order online today or talk to the team about a site survey and estate-wide pricing.