Manton Wood in Worksop is one of DHL Supply Chain’s larger UK fulfilment operations, a site of roughly 50,000 square metres running continuously. A building of that size cannot be taken out of service, and it cannot be protected by cleaning schedules alone: the surfaces that matter are touched by shift after shift, and the people touching them arrive in waves at the same few entry points.
Two problems therefore had to be solved together. Surfaces across an enormous floor area needed protection that kept working between cleans, and the flow of people into the building needed controlling at the point where risk concentrates rather than after everyone was already inside.
What we did
Coverage at this scale is a question of method. Wiping 50,000 square metres is not realistic and spraying it would take far too long, so the site was fogged. Fogging puts the coating onto complex geometry and hard-to-reach surfaces far faster than any other method, which is what makes whole-building treatment possible inside an operational window rather than over weeks.
Alongside the coating we deployed SteriSecure, our access-controlled sanitisation solution, at the entry points. Rather than leaving hand sanitisation as an optional gesture by the door, it was tied directly to building access, so entering the site and sanitising were the same action.
- Whole-site fogging of the fulfilment centre, reaching racking, fixtures and the awkward geometry a manual application would miss
- High-touch surfaces across the working environment, protected between cleans rather than only at the moment of cleaning
- Access-controlled sanitisation at entry points, making hand hygiene a condition of entry rather than a reminder
Why fogging, and what it costs you. Fogging buys coverage per hour, and it is the only realistic method at warehouse scale. The trade-off is airborne concentration: the area must be vacated during application and left for the stated re-entry period. On a site running around the clock, that window is the thing to plan around.
The results
The site was treated end to end, with protection that continued working between cleaning rounds rather than resetting with each one, and with sanitisation built into the way people entered the building. It gave DHL a consistent standard across a very large footprint instead of a patchwork that varied by area and by shift.
What happened next
The combination of a long-life coating and controlled entry became the template for what we describe as complete protection: treat the surfaces people touch, and control the point at which they arrive. It still shapes how we specify for large logistics and manufacturing sites, where the entrance is as much a control point as anything inside the building.